Important information:
1. The embedded PVC pipe requirements: 2 inches of embedded PVC pipe directly to the controller (2) the external power supply leads to 2.5 square line conductor / 5 for 380 v voltage, which leads to the length of about 300 mm3. Conditional equipped with an independent air switch a. embedded 2 inch PVC pipes, which leads to the 2.5 square line / 4 core, which leads to the length of about 500 MM b. cargo ideal height 1200-1400 non-standard Angle: 70 14 MM rebar welding structure of Y type steel (performed by civil parties) cement finish surface cannot exceed Angle iron surface c. package edge Angle sample figure to bottom embedded network graph distance Angle steel sample d. and surrounding reinforced concrete layer bottom not less than 300 MM thick 6 feet in size dock leveler pit construction drawing tolerance range: + / - 5 0 MM units: A diagonal error is not more than 10 MM MM pit pit surface requirements at user level reserved hole must be Fang Zhengping straight, diagonal dimension permissible error less than 10 MM. Size must be strictly in accordance with the supplier to provide installation hole size chart. The user must supply power to the cargoes in advance on the electric cabinet, electric cabinet height generally analyzed the mesa of about 1200 mm. Operation should be considered at the same time can see the yard. Users must be on the edge of the pit position in advance to prepare solid collision package edge Angle (see drawing), Angle iron size not less than 8 #, and must use the hook connected with civil engineering steel fabric in the solid, each distance not greater than 300 mm. Pit in front of a strong/flat on both sides, is used to install anti-collision rubber pad. Pit a backend is a little higher than the front (510 mm), avoid water clean or rainy days. Users need to be embedded in accordance with local safety standards of dark current pipeline (buried under the concrete); Wire and tube diameter of about 30 mm 6 * 1.52 built-in power line, electric tube connected to control button box (included). Button box installed on the wall. Hydraulic unloading platform power supply: 380 v / 50 hz / 0.75 KW (220 v / 50 hz. 0.75 KW). Cllimbing trolley installation the relationship with the exterior wall is divided into inner wall and outer wall, row wiring pipe position based on the specific situation, please. Concrete: civil engineering must be pouring concrete, concrete grade (common)
Important information: 1 pre buried PVC pipeline requirements: 2 inch embedded PVC pipe leads directly to the 2 external power supply controller leads to 2.5 square line /5 core for 380V voltage, leads to a length of about 300mm3. conditions with an independent air switch A. embedded in PVC 2 inch tube, leads to the 2.5 square line /4 core, led length about 500mm B. platform ideal height 1200-1400 non-standard angle: 70 14MM screw thread steel is welded on the structure of Y steel (by construction) cement finished surface can not exceed the angle iron C. wrapping angle pit is embedded network chart drawing steel reinforced distance like figure D. bottom and surrounding reinforced concrete layer thickness not less than 300mm within 6 feet of space size board bridge pit construction diagram of tolerance range: +5/-0MM unit: MM pit diagonal difference of 10MM surface pit pit request level user reservation must be founder straight, diagonal dimension error less than 10mm. Size must be in strict conformity with the supplier to provide installation pit size chart. The user must supply power to the board the bridge of the electric control box, control box height from the platform surface about 1200mm is appropriate. At the same time should be considered when operation can see Deng Axle movement. Anticollision wrapping angle the user must advance in the pit edge to prepare stable (see drawing), angle size can not be less than 8#, and must use the inverted hook and civil steel net stable connection, each distance of not more than 300mm. Pit in front of both sides to strengthen / flat, used to install crash pad. Pit is a little higher than the front end (about 510mm), avoid cleaning or rainy days the water. The user needs to pre buried in accordance with local safety standards of dark electrical conduit (buried under concrete); wire and tube diameter is about 30mm with built-in 6*1.52 power line, tube connected to the control button box (attached). Button box mounted on the wall. Hydraulic unloading platform power: 380v/50Hz/0.75KW (220v/50Hz.0.75KW). The relationship between board installation and external axle is divided into inner wall and outer wall type, please according to the specific situation of distribution line tube position. Concrete: Civil around must be concrete, concrete grade: (ordinary level)
Ann paul wesley