请求帮助翻译成英文,不要机翻!

2024年12月01日 11:47
有2个网友回答
网友(1):

As customers increase the control of multiple sizes of the product, as well as changes in the production process. At the same time, according to the production line model, please check the attached file after the update standard time

网友(2):

Because of the increasing number of our customers, more sizes of products have been required. So the manufacturing technique needs to be adjusted. According to the production status of the sample line, please check the attached "standard time".